Granted
Boulevard Paepsem 18
Anderlecht · 01/C_PLP/1857067 · Prolongation de PE Communal
Boulevard Paepsem 18, Anderlecht: operation of installations. Case octroyé, lodged on 28 September 2022. The decision was notified on 29 September 2023, 366 days after lodging.
het verder uitbaten van een algemene opslagplaats en een verkoelingsinrichting| Permit type | Prolongation de PE Communal | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 28 September 2022 | date the file was received |
| Decision notified | 29 September 2023 | 366 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Declared incomplete
- Declared complete
- Decision notified · Granted
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 93 m | Tree felling | abattre 68 arbres le long des berges de la Senne | 2021 |
| 189 m | Demolition and reconstruction | Démolir un immeuble de bureau désaffecté (R+5) et construire un bâtiment comprenant un showroom au rez-de-chaussée et de | 2022 |
| 189 m | Demolition and reconstruction | Démolir la tour de bureaux désaffecté R+5 et construire une surface de show-room (commerce de gros en matériel sanitaire | 2023 |
| 189 m | Demolition and reconstruction | Démolir une tour de bureaux désaffecté R+5, construire un show-room (commerce spécialisé en matériel sanitaire) au rez-d | 2024 |
| 195 m | Demolition | Démolir deux gazomètres sphériques jusqu'au niveau du sol | 2022 |
Other nearby cases : 01/PU/1972175
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)