Boulevard Poincaré 28–31
Anderlecht · 01/IPE/435514 · Permis d'environnement
Boulevard Poincaré 28–31, Anderlecht: operation of installations. Case annulé, lodged on 3 February 2000.
code nace 1970 :6652->Hôtels sans restaurant| Permit type | Permis d'environnement | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 3 February 2000 | date the file was received |
| Public inquiry | 18 July 2000 – 19 July 2000 | |
| Consultation committee | 13 September 2000 | |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Declared incomplete
- Declared complete
- Public inquiry opened
- Public inquiry closed
- Consultation committee
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 29 m | Façade and windows | régularisation du conduit d'évacuation de la hotte sur la façade arrière | 2022 |
| 29 m | Extension or raising | mettre en conformité la rehausse de la toiture arrière | 2022 |
| 37 m | Split into dwellings | mettre en conformité la modification de la façade à rue, l'ajout d'un logement et des travaux au rez-de-chaussée commerc | 2022 |
| 37 m | Split into dwellings | mettre en conformité la modification de la façade à rue, l'ajout d'un logement et des travaux au rez-de-chaussée commerc | 2024 |
| 51 m | Façade and windows | isoler la façade arrière, la façade pignon et la toiture | 2023 |
Other nearby cases : 01/PU/1865915, 01/PU/1969763, 01/GOU_PU/1951830, 01/SFD/1945354, 01/PU/1811603, 01/SFD/1922730, 01/PU/1865922, 01/GOU_PU/1930709, 04/PFU/1998416, 04/PFU/1926075, 01/GOU_PU/1858115, 01/PU/1851710, 01/PU/1868372, 01/GOU_PU/1856468, 01/PU/1821878, 01/SFD/1908278, 01/PU/1996104, 01/PU/1826539, 04/SFD/1841434, 04/PFD/1825950, 01/PU/1854309, 01/PFD/1853132, 01/PU/2004762, 04/PU/1820333, 04/PU/1964930