Skip to content
AltUrb
Withdrawn

Boulevard Industriel 18

Anderlecht · 01/IPE/436164 · Permis d'environnement

Boulevard Industriel 18, Anderlecht: operation of installations. Case annulé, lodged on 2 April 1999. The decision was notified on 22 September 1999, 173 days after lodging.

distribution énergie code nace 1970 :1614->Entreprises de distribution d'énerg // Prolongation d'exploitation d'un transformateur statique
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typePermis d'environnement
StatusAnnulé
Lodged on2 April 1999date the file was received
Public inquiry3 June 1999 – 4 June 1999
Consultation committee9 June 1999
Decision notified22 September 1999173 days
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Declared complete
  3. Public inquiry opened
  4. Public inquiry closed
  5. Consultation committee
  6. Decision notified · Withdrawn

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
0 mDemolition and reconstructionDémolir l’imprimerie et construire un pôle de logistique urbaine2026
74 mRetail or horeca fit-outplacer un show-case de 39m³2024
74 mOtherplacer un show-case de 39m³2025
161 mExtension or raisingRemplacer le parking étagé (non construit) par une extension du parking existant, ajouter un parking motos et un parking2022
161 mNew constructionPlacer 2 containers vestiaires/douches hommes et femmes pour une durée de limitée à 2 ans, le temps d'aménager des nouve2024

Other nearby cases : 01/PFD/1913329, 01/PFD/1834672, 01/PU/1931579