Withdrawn

Boulevard Industriel 26–28

Anderlecht · 01/IPE/443802 · Permis d'environnement

Boulevard Industriel 26–28, Anderlecht: —. Case annulé, lodged on 26 April 2004.

Key figures
Permit typePermis d'environnement
StatusAnnulé
Lodged on26 April 2004date the file was received
Consultation committee7 July 2004
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Declared incomplete
  3. Declared complete
  4. Consultation committee

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
106 mDemolition and reconstructionDémolir un immeuble de bureau désaffecté (R+5) et construire un bâtiment comprenant un showroom au rez-de-chaussée et de2022
106 mDemolition and reconstructionDémolir la tour de bureaux désaffecté R+5 et construire une surface de show-room (commerce de gros en matériel sanitaire2023
106 mDemolition and reconstructionDémolir une tour de bureaux désaffecté R+5, construire un show-room (commerce spécialisé en matériel sanitaire) au rez-d2024
168 mDemolitionDémolir deux gazomètres sphériques jusqu'au niveau du sol2022
178 mTree fellingabattre 68 arbres le long des berges de la Senne2021