Withdrawn

Boulevard Industriel 135

Anderlecht · 01/IPE/457033 · Permis d'environnement

Boulevard Industriel 135, Anderlecht: operation of installations. Case annulé, lodged on 12 July 2010. The decision was notified on 2 February 2011, 205 days after lodging.

18.B Atelier pour le travail du bois 98,96 kW, 19.A stockage d'article en bois 362 m², 71.A Compresseur d'air 11 kW, 88.1A dépôt de thinner/acétone 100 litres, 138. zone de mise en peinture 1 place, 152.A parking à l'air libre 34 places
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typePermis d'environnement
StatusAnnulé
Lodged on12 July 2010date the file was received
Public inquiry11 October 2010 – 12 October 2010
Consultation committee13 October 2010
Decision notified2 February 2011205 days
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Declared incomplete
  3. Declared complete
  4. Public inquiry opened
  5. Public inquiry closed
  6. Consultation committee
  7. Decision notified · Withdrawn

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
0 mExtension or raisingconstruire une extension d'un entrepôt2022
48 mNew constructionconstruire un hall industriel et des locaux d'activités productives2024
91 mHeavy renovationtransformer sans changement de volume le permis d'urbanisme 48388 (extension des WC Dames et mezzanine au rez-de-chaussé2023
167 mEnergy worksposer des installations techniques pour la recharge de voitures électriques2022
167 mEnergy worksplacer des installations techniques pour la recharge de voitures électriques2023

Other nearby cases : 01/PFD/1908669, 01/PU/1938453, 01/PFD/1952064, 01/PFD/1966649

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)