Anderlecht · 01/IPE/462796 · Permis d'environnement
Boulevard Industriel 30, Anderlecht: operation of installations. Case annulé, lodged on 29 February 2012. The decision was notified on 29 June 2012, 121 days after lodging.
exploitation d'un magasin pour la vente au détail de matériaux de construction| Permit type | Permis d'environnement | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 29 February 2012 | date the file was received |
| Public inquiry | 30 April 2012 – 15 May 2012 | |
| Decision notified | 29 June 2012 | 121 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Declared incomplete
- Declared complete
- Public inquiry opened
- Public inquiry closed
- Decision notified · Withdrawn
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 0 m | Demolition and reconstruction | Démolir un immeuble de bureau désaffecté (R+5) et construire un bâtiment comprenant un showroom au rez-de-chaussée et de | 2022 |
| 0 m | Demolition and reconstruction | Démolir une tour de bureaux désaffecté R+5, construire un show-room (commerce spécialisé en matériel sanitaire) au rez-d | 2024 |
| 0 m | Demolition and reconstruction | Démolir la tour de bureaux désaffecté R+5 et construire une surface de show-room (commerce de gros en matériel sanitaire | 2023 |
| 162 m | Tree felling | abattre 68 arbres le long des berges de la Senne | 2021 |
| 189 m | Change of use | changer l'affectation d'espaces de bureaux en espace de stockage (maintien d'un espace bureaux au rez-de-chaussée) | 2025 |
Other nearby cases : 01/PU/1820250, 01/PU/2033060, 01/PU/1850168, 01/GOU_PU/1916777, 01/PU/1958917
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)