Skip to content
AltUrb
Granted

Boulevard Industriel 139

Anderlecht · 01/IPE/652194 · Permis d'environnement

Boulevard Industriel 139, Anderlecht: operation of installations. Case octroyé, lodged on 22 September 2017. The decision was notified on 21 March 2018, 180 days after lodging.

dépôt de produits alimentaires
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typePermis d'environnement
StatusOctroyé
Lodged on22 September 2017date the file was received
Public inquiry1 January 2018 – 16 January 2018
Consultation committee18 January 2018
Decision notified21 March 2018180 days
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Declared incomplete
  3. Declared complete
  4. Public inquiry opened
  5. Public inquiry closed
  6. Consultation committee
  7. Decision notified · Granted

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
0 mNew constructionconstruire un hall industriel et des locaux d'activités productives2024
48 mExtension or raisingconstruire une extension d'un entrepôt2022
97 mHeavy renovationtransformer sans changement de volume le permis d'urbanisme 48388 (extension des WC Dames et mezzanine au rez-de-chaussé2023
127 mEnergy worksplacer des installations techniques pour la recharge de voitures électriques2023
127 mEnergy worksposer des installations techniques pour la recharge de voitures électriques2022

Other nearby cases : 01/PU/1938453, 01/PFD/1952064, 01/PFD/1908669

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)