Granted
Boulevard Industriel 130
Anderlecht · 01/IPEEXT/1696625 · Extension / Transformation de PE
Boulevard Industriel 130, Anderlecht: operation of installations. Case octroyé, lodged on 11 December 2018. The decision was notified on 28 December 2018, 17 days after lodging.
Changement des modalités et quantités de stockage de solvants et eaux chargées (en détergents/graisses) stockés sur site| Permit type | Extension / Transformation de PE | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 11 December 2018 | date the file was received |
| Decision notified | 28 December 2018 | 17 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Decision notified · Granted
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 100 m | Signs and advertising | Installer un dispositif publicitaire digital de 2 m² (MU783) à hauteur du n°122 boulevard Industriel | 2023 |
| 147 m | Signs and advertising | Maintenir un panneau publicitaire non éclairé de 20 m², situé sur un talus à proximité du boulevard Industriel 116. | 2024 |
| 179 m | Extension or raising | construire une extension d'un entrepôt | 2022 |
| 196 m | Heavy renovation | transformer sans changement de volume le permis d'urbanisme 48388 (extension des WC Dames et mezzanine au rez-de-chaussé | 2023 |
| 226 m | New construction | construire un hall industriel et des locaux d'activités productives | 2024 |
Other nearby cases : 01/PU/1908338, 01/PFD/1952064, 01/PU/1938453
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)