Withdrawn
Boulevard Industriel 25
Anderlecht · 01/IPEEXT/1726174 · Extension / Transformation de PE
Boulevard Industriel 25, Anderlecht: operation of installations. Case annulé, lodged on 18 September 2019. The decision was notified on 17 October 2019, 29 days after lodging.
modification| Permit type | Extension / Transformation de PE | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 18 September 2019 | date the file was received |
| Decision notified | 17 October 2019 | 29 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Decision notified · Withdrawn
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 186 m | Demolition and reconstruction | Démolir un immeuble de bureau désaffecté (R+5) et construire un bâtiment comprenant un showroom au rez-de-chaussée et de | 2022 |
| 186 m | Demolition and reconstruction | Démolir une tour de bureaux désaffecté R+5, construire un show-room (commerce spécialisé en matériel sanitaire) au rez-d | 2024 |
| 186 m | Demolition and reconstruction | Démolir la tour de bureaux désaffecté R+5 et construire une surface de show-room (commerce de gros en matériel sanitaire | 2023 |
| 221 m | Signs and advertising | poser 4 enseignes lumineuses sur la façade | 2021 |
| 231 m | Retail or horeca fit-out | modifier la destination d'un commerce en horeca de type brasserie | 2022 |
Other nearby cases : 01/PU/1958917, 01/GOU_PU/1916777
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)