Skip to content
AltUrb
Withdrawn

Parc du Peterbos 9

Anderlecht · 01/IPEEXT/1923623 · Extension / Transformation de PE

Parc du Peterbos 9, Anderlecht: operation of installations. Case annulé, lodged on 17 November 2023. The decision was notified on 7 December 2023, 20 days after lodging.

Bijkomende asbestwerken
The application's own description, in its source language (NL). Source: Nova.
Key figures
Permit typeExtension / Transformation de PE
StatusAnnulé
Lodged on17 November 2023date the file was received
Decision notified7 December 202320 days
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Decision notified · Withdrawn

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
44 mPublic spaceLa démolition d'un parking, la construction d'un pole d'équipments et de ses abords du parc Peterbos2022
77 mNew constructionDemande de permis de durée limitée (2 ans): Placer des conteneurs contenant des installations sanitaires sur un terrain 2024
83 mPublic spaceRéaménager et requalifier les espaces publics du site du Peterbos dans le cadre du Contrat de Quartier Durable Peterbos.2023
91 mHeavy renovationModifier le permis 01/PFD/1767262: modifications mineures des plans des appartements et des ouvertures de façade2023
115 mNew constructionConstruire une nouvelle crèche pour 49 enfants dans le parc du Peterbos.2022

Other nearby cases : 01/PFD/1995180, 01/PFD/1838424, 01/PFD/1831023, 01/PFD/1989379, 01/PU/1970834, 01/PU/1855166, 01/PFD/1861839, 01/PU/1848725, 01/PU/1905348, 01/PU/2032593

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)