Withdrawn
Parc du Peterbos 9
Anderlecht · 01/IPEEXT/1923623 · Extension / Transformation de PE
Parc du Peterbos 9, Anderlecht: operation of installations. Case annulé, lodged on 17 November 2023. The decision was notified on 7 December 2023, 20 days after lodging.
Bijkomende asbestwerken| Permit type | Extension / Transformation de PE | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 17 November 2023 | date the file was received |
| Decision notified | 7 December 2023 | 20 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Decision notified · Withdrawn
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 44 m | Public space | La démolition d'un parking, la construction d'un pole d'équipments et de ses abords du parc Peterbos | 2022 |
| 77 m | New construction | Demande de permis de durée limitée (2 ans): Placer des conteneurs contenant des installations sanitaires sur un terrain | 2024 |
| 83 m | Public space | Réaménager et requalifier les espaces publics du site du Peterbos dans le cadre du Contrat de Quartier Durable Peterbos. | 2023 |
| 91 m | Heavy renovation | Modifier le permis 01/PFD/1767262: modifications mineures des plans des appartements et des ouvertures de façade | 2023 |
| 115 m | New construction | Construire une nouvelle crèche pour 49 enfants dans le parc du Peterbos. | 2022 |
Other nearby cases : 01/PFD/1995180, 01/PFD/1838424, 01/PFD/1831023, 01/PFD/1989379, 01/PU/1970834, 01/PU/1855166, 01/PFD/1861839, 01/PU/1848725, 01/PU/1905348, 01/PU/2032593
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)