Skip to content
AltUrb
Withdrawn

Boulevard International 11

Anderlecht · 01/IPEEXT/457382 · Extension / Transformation de PE

Boulevard International 11, Anderlecht: operation of installations. Case annulé, lodged on 8 November 2010. The decision was notified on 22 November 2010, 14 days after lodging.

parkeerplaatsen voor het personeel
The application's own description, in its source language (NL). Source: Nova.
Key figures
Permit typeExtension / Transformation de PE
StatusAnnulé
Lodged on8 November 2010date the file was received
Decision notified22 November 201014 days
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Decision notified · Withdrawn

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
0 mEnergy worksplacer des installations techniques pour la recharge de voitures électriques2023
0 mEnergy worksposer des installations techniques pour la recharge de voitures électriques2022
127 mNew constructionconstruire un hall industriel et des locaux d'activités productives2024
136 mHeavy renovationtransformer sans changement de volume le permis d'urbanisme 48388 (extension des WC Dames et mezzanine au rez-de-chaussé2023
167 mExtension or raisingconstruire une extension d'un entrepôt2022

Other nearby cases : 01/PU/1938453, 01/PFD/1952064

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)