Boulevard International 11

Anderlecht · 01/IPEEXT/459226 · Extension / Transformation de PE

Boulevard International 11, Anderlecht: operation of installations. Case annulé, lodged on 12 August 2011. The decision was notified on 7 September 2011, 26 days after lodging.

Pose d'une borne de rechargement pour voitures électriques
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typeExtension / Transformation de PE
StatusAnnulé
Lodged on12 August 2011date the file was received
Decision notified7 September 201126 days
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Decision notified · Withdrawn

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
0 mEnergy worksposer des installations techniques pour la recharge de voitures électriques2022
0 mEnergy worksplacer des installations techniques pour la recharge de voitures électriques2023
127 mNew constructionconstruire un hall industriel et des locaux d'activités productives2024
136 mHeavy renovationtransformer sans changement de volume le permis d'urbanisme 48388 (extension des WC Dames et mezzanine au rez-de-chaussé2023
167 mExtension or raisingconstruire une extension d'un entrepôt2022

Other nearby cases : 01/PFD/1952064, 01/PU/1938453