Withdrawn
Boulevard de l'Humanité 55
Anderlecht · 01/IPEEXT/478796 · Extension / Transformation de PE
Boulevard de l'Humanité 55, Anderlecht: operation of installations. Case annulé, lodged on 6 November 2012. The decision was notified on 5 December 2012, 29 days after lodging.
Modification de permis portant sur la diminution du stock de produits inflammables à un seuil inférieur à 500 litres et sur la suppression d'une groupe de froid (GF01)| Permit type | Extension / Transformation de PE | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 6 November 2012 | date the file was received |
| Decision notified | 5 December 2012 | 29 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Decision notified · Withdrawn
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 75 m | Regularisation | Mise en conformité d'un bien suite à la réalisation de travaux. | 2021 |
| 75 m | Façade and windows | Mettre en conformité la modification de la façade, la modification de la citerne et la non mise en œuvre de la toiture v | 2022 |
| 75 m | Regularisation | Mise en conformité d'un bien suite à la réalisation de travaux. | 2022 |
| 75 m | Extension or raising | rehausser la toiture du bâtiment, aménager une échelle à crinoline, réaménager la zone de recul et mettre en conformité | 2024 |
| 209 m | Signs and advertising | maintenir un dispoisitif publicitaire de 36 m² | 2025 |
Other nearby cases : 01/PU/1989386
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)