Withdrawn
Chaussée de Mons 1424
Anderlecht · 01/IPEEXT/500199 · Extension / Transformation de PE
Chaussée de Mons 1424, Anderlecht: operation of installations. Case annulé, lodged on 3 April 2014. The decision was notified on 25 April 2014, 22 days after lodging.
Ajout d’un groupe électrogène et ses équipements complémentaires comme le réservoir à fuel, des équipements autorisés mais non mis en œuvre dans les deux ans (laboratoires, groupe de ventilation, machines frigorifiques)| Permit type | Extension / Transformation de PE | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 3 April 2014 | date the file was received |
| Decision notified | 25 April 2014 | 22 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Decision notified · Withdrawn
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 1 m | Other | Installer un mat haubané sur la toiture du bâtiment. | 2021 |
| 139 m | Extension or raising | construire une extension de plain-pieds de 414 m² de l'entrepôt du bâtiment IKEA, ainsi que d'un auvent de 65 m², pour l | 2026 |
| 139 m | Energy works | aménager une infrastructure de recharge comprenant 5 chargeurs rapides et 30 chargeurs lents, avec les abris et la cabin | 2024 |
| 179 m | Signs and advertising | Régulariser un dispositif publicitaire digital double face de 8 m² (SV24) | 2025 |
| 179 m | Signs and advertising | Régulariser un dispositif publicitaire digital double face de 8 m² (SV24). | 2026 |
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)
