Withdrawn
Boulevard Industriel 115
Anderlecht · 01/IPEEXT/528815 · Extension / Transformation de PE
Boulevard Industriel 115, Anderlecht: operation of installations. Case annulé, lodged on 19 May 2014. The decision was notified on 1 July 2014, 43 days after lodging.
Modification de l'implantation d'une partie des emplacements de parking à l'air libre| Permit type | Extension / Transformation de PE | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 19 May 2014 | date the file was received |
| Decision notified | 1 July 2014 | 43 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Decision notified · Withdrawn
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 134 m | Change of use | changer l'affectation d'un centre de véhicules d'occasion en entrepôt avec show-room | 2023 |
| 171 m | Extension or raising | construire une extension d'un entrepôt | 2022 |
| 175 m | Signs and advertising | Maintenir un panneau publicitaire non éclairé de 20 m², situé sur un talus à proximité du boulevard Industriel 116. | 2024 |
| 177 m | Signs and advertising | Installer un dispositif publicitaire digital de 2 m² (MU783) à hauteur du n°122 boulevard Industriel | 2023 |
| 186 m | New construction | construire un hall industriel et des locaux d'activités productives | 2024 |
Other nearby cases : 01/PU/1869846, 01/PU/1989386
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)