Boulevard Industriel 25

Anderlecht · 01/IPEEXT/585147 · Extension / Transformation de PE

Boulevard Industriel 25, Anderlecht: operation of installations. Case annulé, lodged on 6 November 2015. The decision was notified on 27 November 2015, 21 days after lodging.

Modification des conditions d'exploiter relatives aux installations de combustions, aux installations de climatisation ainsi qu'aux groupes électrogènes
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typeExtension / Transformation de PE
StatusAnnulé
Lodged on6 November 2015date the file was received
Decision notified27 November 201521 days
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Decision notified · Withdrawn

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
186 mDemolition and reconstructionDémolir un immeuble de bureau désaffecté (R+5) et construire un bâtiment comprenant un showroom au rez-de-chaussée et de2022
186 mDemolition and reconstructionDémolir la tour de bureaux désaffecté R+5 et construire une surface de show-room (commerce de gros en matériel sanitaire2023
186 mDemolition and reconstructionDémolir une tour de bureaux désaffecté R+5, construire un show-room (commerce spécialisé en matériel sanitaire) au rez-d2024
221 mSigns and advertisingposer 4 enseignes lumineuses sur la façade2021
231 mRetail or horeca fit-outmodifier la destination d'un commerce en horeca de type brasserie2022

Other nearby cases : 01/GOU_PU/1916777, 01/PU/1958917

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)