Withdrawn
Boulevard Industriel 25
Anderlecht · 01/IPEEXT/585147 · Extension / Transformation de PE
Boulevard Industriel 25, Anderlecht: operation of installations. Case annulé, lodged on 6 November 2015. The decision was notified on 27 November 2015, 21 days after lodging.
Modification des conditions d'exploiter relatives aux installations de combustions, aux installations de climatisation ainsi qu'aux groupes électrogènes| Permit type | Extension / Transformation de PE | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 6 November 2015 | date the file was received |
| Decision notified | 27 November 2015 | 21 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Decision notified · Withdrawn
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 186 m | Demolition and reconstruction | Démolir un immeuble de bureau désaffecté (R+5) et construire un bâtiment comprenant un showroom au rez-de-chaussée et de | 2022 |
| 186 m | Demolition and reconstruction | Démolir la tour de bureaux désaffecté R+5 et construire une surface de show-room (commerce de gros en matériel sanitaire | 2023 |
| 186 m | Demolition and reconstruction | Démolir une tour de bureaux désaffecté R+5, construire un show-room (commerce spécialisé en matériel sanitaire) au rez-d | 2024 |
| 221 m | Signs and advertising | poser 4 enseignes lumineuses sur la façade | 2021 |
| 231 m | Retail or horeca fit-out | modifier la destination d'un commerce en horeca de type brasserie | 2022 |
Other nearby cases : 01/GOU_PU/1916777, 01/PU/1958917
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)