Boulevard Industriel 30, Anderlecht: heavy renovation. Case annulé, lodged on 31 March 2017. The decision was notified on 28 April 2017, 28 days after lodging.
Régularisation de diverses modifications internes au magasin| Permit type | Extension / Transformation de PE | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 31 March 2017 | date the file was received |
| Decision notified | 28 April 2017 | 28 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Decision notified · Withdrawn
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 0 m | Demolition and reconstruction | Démolir un immeuble de bureau désaffecté (R+5) et construire un bâtiment comprenant un showroom au rez-de-chaussée et de | 2022 |
| 0 m | Demolition and reconstruction | Démolir une tour de bureaux désaffecté R+5, construire un show-room (commerce spécialisé en matériel sanitaire) au rez-d | 2024 |
| 0 m | Demolition and reconstruction | Démolir la tour de bureaux désaffecté R+5 et construire une surface de show-room (commerce de gros en matériel sanitaire | 2023 |
| 162 m | Tree felling | abattre 68 arbres le long des berges de la Senne | 2021 |
| 189 m | Change of use | changer l'affectation d'espaces de bureaux en espace de stockage (maintien d'un espace bureaux au rez-de-chaussée) | 2025 |
Other nearby cases : 01/PU/1820250, 01/PU/2033060, 01/PU/1850168, 01/GOU_PU/1916777, 01/PU/1958917