Withdrawn
Boulevard de l'Humanité 55
Anderlecht · 01/IPEEXT/685607 · Extension / Transformation de PE
Boulevard de l'Humanité 55, Anderlecht: operation of installations. Case annulé, lodged on 8 June 2018. The decision was notified on 4 July 2018, 26 days after lodging.
Extension pour suppression de groupe de froid au R22 avec nouveaux groupes de froid et déplacement d’armoires de sécurité concernant des STOCKS type 88 1A et 88 2A
Modification des conditions d’exploiter relatives au stockage de substances dangereuses en armoire de sécurité et non en local de stockage
| Permit type | Extension / Transformation de PE | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 8 June 2018 | date the file was received |
| Decision notified | 4 July 2018 | 26 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Decision notified · Withdrawn
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 75 m | Regularisation | Mise en conformité d'un bien suite à la réalisation de travaux. | 2021 |
| 75 m | Façade and windows | Mettre en conformité la modification de la façade, la modification de la citerne et la non mise en œuvre de la toiture v | 2022 |
| 75 m | Regularisation | Mise en conformité d'un bien suite à la réalisation de travaux. | 2022 |
| 75 m | Extension or raising | rehausser la toiture du bâtiment, aménager une échelle à crinoline, réaménager la zone de recul et mettre en conformité | 2024 |
| 209 m | Signs and advertising | maintenir un dispoisitif publicitaire de 36 m² | 2025 |
Other nearby cases : 01/PU/1989386
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)