Granted
Route de Lennik
Anderlecht · 01/IPEPLP/1847913 · Prolongation de PE
Route de Lennik, Anderlecht: operation of installations. Case octroyé, lodged on 4 July 2022. The decision was notified on 30 June 2023, 361 days after lodging.
Prolongation du permis d'environnement pour l’exploitation des transformateurs et des batteries stationnaires d’une sous-station électrique de la station de métro Erasme| Permit type | Prolongation de PE | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 4 July 2022 | date the file was received |
| Decision notified | 30 June 2023 | 361 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Declared incomplete
- Declared complete
- Decision notified · Granted
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 32 m | Signs and advertising | remplacer le mobilier publicitaire existant par un totem digital double face (métro Erasme - accès n°2) | 2023 |
| 84 m | Energy works | installer un conteneur à batterie avec convertisseur intégré sur le parking existant | 2025 |
| 87 m | Extension or raising | installation d'une couverture (carport) avec des panneaux PV sur le toit du parking Indigo | 2023 |
| 182 m | Signs and advertising | Implanter une signalétique électrique, cohérente et homogène adaptée à chacun des campus de l'ULB. Il s'agit de bien sig | 2022 |
| 205 m | Signs and advertising | Modification du permis : 01/PFD/1841805 Renouveler la signalétique extérieure du campus Erasme à Anderlecht | 2023 |
Other nearby cases : 01/PU/1855171, 01/AA/1831463, 01/PFD/1911451