Skip to content
AltUrb
Withdrawn

Boulevard Industriel 16

Anderlecht · 01/IPEPLP/446869 · Prolongation de PE

Boulevard Industriel 16, Anderlecht: operation of installations. Case annulé, lodged on 26 September 2005. The decision was notified on 22 December 2006, 452 days after lodging.

plp des permis 95/0307 (65737) et 96/0445 (66357) pour le centre de tri postal
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typeProlongation de PE
StatusAnnulé
Lodged on26 September 2005date the file was received
Decision notified22 December 2006452 days
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Declared incomplete
  3. Declared complete
  4. Decision notified · Withdrawn

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
219 mDemolition and reconstructionDémolir l’imprimerie et construire un pôle de logistique urbaine2026
232 mDemolitionDémolir deux gazomètres sphériques jusqu'au niveau du sol2022

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)