Withdrawn
Boulevard International 11
Anderlecht · 01/IPEPLP/447449 · Prolongation de PE
Boulevard International 11, Anderlecht: operation of installations. Case annulé, lodged on 23 January 2006. The decision was notified on 31 July 2006, 189 days after lodging.
Benzinestation dat de volgende ingedeelde inrichtingen bevat;
compressor (Rubriek 71A), opslag van gasflessen (Rubriek 74A), tank van 20.000l Eurosuper, tank van 30.000l Eurosuper, tank van 30.000l Superplus (Rubriek 881B), tank van 20.000l en 30.000l Diesel (Rubriek 883B), opslag gevaarlijke stoffen (antivries, smeeroliën...) (Rubriek121A), koelinrichting (Rubriek 132A)| Permit type | Prolongation de PE | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 23 January 2006 | date the file was received |
| Decision notified | 31 July 2006 | 189 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Declared incomplete
- Declared complete
- Decision notified · Withdrawn
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 0 m | Energy works | poser des installations techniques pour la recharge de voitures électriques | 2022 |
| 0 m | Energy works | placer des installations techniques pour la recharge de voitures électriques | 2023 |
| 127 m | New construction | construire un hall industriel et des locaux d'activités productives | 2024 |
| 136 m | Heavy renovation | transformer sans changement de volume le permis d'urbanisme 48388 (extension des WC Dames et mezzanine au rez-de-chaussé | 2023 |
| 167 m | Extension or raising | construire une extension d'un entrepôt | 2022 |
Other nearby cases : 01/PFD/1952064, 01/PU/1938453
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)