Granted
Boulevard Industriel 141
Anderlecht · 01/IPEPLP/496348 · Prolongation de PE
Boulevard Industriel 141, Anderlecht: operation of installations. Case octroyé, lodged on 10 January 2014. The decision was notified on 2 September 2014, 235 days after lodging.
Exploitation d'un atelier du travail du bois| Permit type | Prolongation de PE | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 10 January 2014 | date the file was received |
| Decision notified | 2 September 2014 | 235 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Declared incomplete
- Declared complete
- Decision notified · Granted
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 94 m | New construction | construire un hall industriel et des locaux d'activités productives | 2024 |
| 128 m | Energy works | poser des installations techniques pour la recharge de voitures électriques | 2022 |
| 128 m | Energy works | placer des installations techniques pour la recharge de voitures électriques | 2023 |
| 137 m | Extension or raising | construire une extension d'un entrepôt | 2022 |
| 181 m | Heavy renovation | transformer sans changement de volume le permis d'urbanisme 48388 (extension des WC Dames et mezzanine au rez-de-chaussé | 2023 |
Other nearby cases : 01/PFD/1847791
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)