Route de Mont Saint-Jean, Auderghem: operation of installations. Case annulé, lodged on 17 September 2019. The decision was notified on 4 November 2019, 48 days after lodging.
010B4_32010B4| Permit type | Permis d'environnement | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 17 September 2019 | date the file was received |
| Decision notified | 4 November 2019 | 48 days |
| Works started | 7 June 2021 | |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Decision notified · Withdrawn
- Works started
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 32 m | Public space | Construire une cyclostrade au niveau des tronçons Dry-Borren-Jezus-Eik du côté sud de l'E411, utiliser le tunnel pour ch | 2026 |
| 96 m | Public space | Ré-étanchéifier les tunnels du carrefour Léonard (dont une partie est sur le territoire de la RBC). Préalablement, les c | 2025 |
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)