Withdrawn
Boulevard du Souverain 384–388
Auderghem · 02/IPE/450117 · Permis d'environnement
Boulevard du Souverain 384–388, Auderghem: new construction. Case annulé, lodged on 10 January 2007. It comprises 42 dwellings.
Permis mixte : construction d'un immeuble de logements (42 appartements)
- 45 emplacements couverts (68B)
- 12 emplacements à l'air libre (152A)42
Dwellings created
| Permit type | Permis d'environnement | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 10 January 2007 | date the file was received |
| Public inquiry | 2 April 2007 – 3 April 2007 | |
| Consultation committee | 10 May 2007 | |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Declared incomplete
- Declared complete
- Public inquiry opened
- Public inquiry closed
- Consultation committee
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 39 m | Heavy renovation | mettre en conformité le nombre de chambres d’un appartement au 1er étage et la transformation d'un emplacement de parkin | 2024 |
| 82 m | Tree felling | abattre 25 arbres | 2022 |
| 102 m | Heavy renovation | mettre en conformité la situation de fait et transformer une maison unifamiliale | 2024 |
| 154 m | Façade and windows | isoler une maison unifamiliale par l'extérieur - SANS SUITE | 2025 |
| 159 m | Energy works | installer une pompe à chaleur sur une terrasse au cinquième étage d'un immeuble à appartements | 2026 |
Other nearby cases : 02/PU/1927039, 02/PU/1962332, 02/PFD/1961983, 02/PU/2014288, 02/PFD/1864255
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)