Skip to content
Altaica Urban
Withdrawn

Route de Mont Saint-Jean

Auderghem · 02/IPE/703414 · Permis d'environnement

Route de Mont Saint-Jean, Auderghem: —. Case annulé, lodged on 26 October 2018. The decision was notified on 20 November 2018, 25 days after lodging.

02LRD
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typePermis d'environnement
StatusAnnulé
Lodged on26 October 2018date the file was received
Decision notified20 November 201825 days
Works started19 November 2018
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Works started
  3. Decision notified · Withdrawn

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
195 mPublic spaceConstruire une cyclostrade au niveau des tronçons Dry-Borren-Jezus-Eik du côté sud de l'E411, utiliser le tunnel pour ch2026
218 mPublic spaceRé-étanchéifier les tunnels du carrefour Léonard (dont une partie est sur le territoire de la RBC). Préalablement, les c2025

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)