Boulevard des Invalides 218–220
Auderghem · 02/IPEEXT/458609 · Extension / Transformation de PE
Boulevard des Invalides 218–220, Auderghem: operation of installations. Case annulé, lodged on 30 May 2011. The decision was notified on 22 June 2011, 23 days after lodging.
mise en place de 5 installations de refroidissement| Permit type | Extension / Transformation de PE | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 30 May 2011 | date the file was received |
| Decision notified | 22 June 2011 | 23 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Decision notified · Withdrawn
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 1 m | Signs and advertising | placer 3 enseignes lumineuses pour BEOBANK | 2022 |
| 76 m | Signs and advertising | placer un totem digital double face (proximité entrée métro Delta). | 2025 |
| 79 m | Signs and advertising | Placer 2 dispositifs publicitaires de 2m² rétro-éclairé intégré aux stations Villo! jusqu'à l'échéance de la convention | 2023 |
| 82 m | Other | construire un escalier extérieur pour les activités productives du rez-de-chaussée de l'aile A situé dans le bâtiment 10 | 2024 |
| 82 m | Heavy renovation | installer un escalier extérieur reliant le rez-de-chaussée au jardin situé au -1 | 2025 |
Other nearby cases : 02/SFD/1990125, 02/PP/1911168, 02/PU/2001315, 02/SFD/2017266, 02/PU/2040209, 02/PFD/1982885, 02/PU/1924562, 02/PFD/1801350, 02/PP/1893136, 02/PU/1935635, 02/PU/1848593, 02/PU/1914469, 02/PU/1848199, 02/PU/1996947, 02/PU/1967696, 02/PU/1835450, 02/PU/1822596, 02/PFU/2009719, 02/PU/1918494, 02/PU/1957706, 02/PU/2031669, 02/PU/1995105, 02/PFD/1911074, 02/PU/1936659, 02/PU/1811617
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)