Granted
Boulevard du Triomphe
Auderghem · 02/PFD/493953 · Permis d'urbanisme délivré par le FD
Boulevard du Triomphe, Auderghem: other. Case octroyé, lodged on 6 November 2013. The decision was notified on 2 October 2014, 330 days after lodging.
Utiliser temporairement un terrain à l'air libre pour stationner 48 véhicules (demande modifiée: initialement 50 places).| Permit type | Permis d'urbanisme délivré par le FD | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 6 November 2013 | date the file was received |
| Decision notified | 2 October 2014 | 330 days |
| Floor areas | — | not reported by the source |
| Competent authority | BUP |
Timeline
- Application lodged
- Declared incomplete
- Declared complete
- Decision notified · Granted
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 116 m | Façade and windows | Il s'agit d'isoler les façades latérales d’un immeuble à appartements | 2024 |
| 116 m | Façade and windows | isoler les façades latérales d’un immeuble à appartements | 2024 |
| 116 m | Split into dwellings | mettre en conformité la division d'un appartement en deux appartements (régularisation simplifiée, art. 330§3 du CoBAT) | 2026 |
| 216 m | Tree felling | Abattre 29 arbres dont 1 sécurisation par réduction pour raisons phytosanitaires au Parc Tercoigne + 9 plantations | 2025 |
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)