Granted
Autoroute E411
Auderghem · 02/PFU/1966157 · Permis d'urbanisme unique délivré par le FD
Autoroute E411, Auderghem: public space. Case octroyé, lodged on 5 December 2024. The decision was notified on 25 March 2025, 110 days after lodging.
Restaurer complètement le viaduc des Trois Fontaines (intrados et extrados).| Permit type | Permis d'urbanisme unique délivré par le FD | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 5 December 2024 | date the file was received |
| Decision notified | 25 March 2025 | 110 days |
| Floor areas | — | not reported by the source |
| Competent authority | BUP |
Timeline
- Application lodged
- Declared complete
- Decision notified · Granted
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 19 m | Public space | Réaménager les espaces publics et le parking situés sous le Viaduc des Trois Fontaines et réaliser des travaux d’égoutta | 2025 |
| 155 m | Extension or raising | remplacer et agrandir le bâtiment administratif accessoire à un équipement (déchèterie Recypark) | 2023 |
| 166 m | New construction | Remplacer les bâtiments modulaires par un bâtiment à deux étages avec un bureau, un bubble, une kitchenette et un local | 2022 |
| 210 m | New construction | Construire des 4 terrains de padel couverts sur le site du Centre Sportif de la Forêt de Soignes; Aménager un nouveau pa | 2024 |
| 242 m | New construction | demande initiale : édifier une structure autoportante métallique, bâchée de PVC, au-dessus de 3 terrains de tennis, dont | 2022 |
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)