Granted
Boulevard du Triomphe 204–216
Auderghem · 02/PU/1974316 · Permis d'urbanisme privé
Boulevard du Triomphe 204–216, Auderghem: merger of dwellings. Case octroyé, lodged on 19 February 2025. The decision was notified on 19 September 2025, 212 days after lodging.
modifier le permis 15365 ainsi que remplacer 3 kots par une conciergerie, remplacer des tôles métalliques au rez-de-chaussée et en façade (immeuble n°214)| Permit type | Permis d'urbanisme privé | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 19 February 2025 | date the file was received |
| Decision notified | 19 September 2025 | 212 days |
| Competent authority | Auderghem |
Timeline
- Application lodged
- Declared incomplete
- Declared complete
- Decision notified · Granted
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 0 m | Signs and advertising | installer 2 enseignes-bannières à l'avant du bâtiment les Orangeries (maison de repos) NDL | 2021 |
| 157 m | Energy works | placer deux pompes à chaleur sur la toiture de deux bâtiments de bureaux et d’activité productive | 2022 |
| 157 m | Public space | réaménager les abords (placement de bancs, création de nouveaux emplacements de stationnement pour véhicules automobiles | 2022 |
| 157 m | Energy works | mettre en conformité la modification des emplacement de stationnement pour vélos et pour voiture et modifier les install | 2026 |
| 242 m | Tree felling | mise en conformité, suite à un arrêté du Bourgmestre, de l'abattage de 17 arbres à haute tige | 2023 |
Other nearby cases : 09/AA/1923477
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)