Skip to content
Altaica Urban
Granted

Avenue de Cortenbergh 89

Bruxelles · 04/C_PLP/1850394 · Prolongation de PE Communal

Avenue de Cortenbergh 89, Bruxelles: operation of installations. Case octroyé, lodged on 29 July 2022.

prolongation du C107/2008 (expire le 05/12/2023)
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typeProlongation de PE Communal
StatusOctroyé
Lodged on29 July 2022date the file was received
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Declared incomplete
  3. Declared complete

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
0 mOtherInstaller 3 antennes sur la toiture du bâtiment, en les fixant sur 2 structures Telenet existantes, et un local techniqu2026
25 mExtension or raisingd’une part, remplacer les châssis du sous-sol et du 3ème étage de la façade avant par des châssis en PVC (mise en confor2026
54 mFaçade and windowsd’une part, modifier la devanture commerciale du rez-de-chaussée (mise en conformité) et d’autre part, isoler les façade2025
54 mSigns and advertisingchanger deux enseignes lumineuses (Régularisation)2022
63 mSigns and advertisingplacer une enseigne lumineuse parallèle en façade avant2023

Other nearby cases : 04/PFD/1864974, 04/PU/1921760, 04/PU/2006902, 04/PU/1821486, 04/PU/1900153, 04/PU/1965704, 04/PU/1850018, 04/PU/2026565, 04/PU/1983522, 04/SFD/1988791, 04/PU/1969024, 04/PU/1969023, 04/PU/1909247, 04/PU/1801434, 04/PU/1898473, 04/PU/1902230, 04/PU/1953432, 04/PU/2001733, 04/PFU/2029296, 04/PFU/1958353, 04/PU/1847906, 04/PU/2026129, 04/PU/2018962, 04/PU/1982561, 04/PU/1907222

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)