Skip to content
Altaica Urban
Granted

Tunnel Van Praet

Bruxelles · 04/CL3/1836326 · Déclaration préalable Communal

Tunnel Van Praet, Bruxelles: —. Case octroyé, lodged on 30 March 2022.

werf
The application's own description, in its source language (NL). Source: Nova.
Key figures
Permit typeDéclaration préalable Communal
StatusOctroyé
Lodged on30 March 2022date the file was received
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Declared incomplete
  3. Declared complete

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
75 mPublic spaceInstaller des groupes de climatisation en voirie pour le local technique du tunnel Van Praet. Ces groupes sont nécessair2025
106 mSigns and advertisingmaintenir l'exploitation d'un dispositif publicitaire par un nouveau panneau de 8 m²2024
106 mSigns and advertisingmaintenir l'exploitation d'un dispositif publicitaire par un nouveau panneau de 8 m²2023
111 mSigns and advertisingmaintenir un panneau publicitaire de 87m² sur un pignon2025
137 mRoofconstruire une structure en toiture pour supporter l'installation de panneaux photovoltaïques2022

Other nearby cases : 04/GOU_PU/2013079, 04/PU/1987379, 04/GOU_PU/1898511, 04/PU/1848113, 04/PU/1865913, 04/PU/1851586, 04/PU/2029650, 04/PFD/1965654, 04/PFU/1922602

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)