Granted
Avenue du Port 104–106
Bruxelles · 04/IPE/1833899 · Permis d'environnement
Avenue du Port 104–106, Bruxelles: operation of installations. Case octroyé, lodged on 4 March 2022. The decision was notified on 1 September 2022, 181 days after lodging.
Augmentation du stockage temporaire de marchandises saisies par la Douane et Accises à l’importation (bâtiment D, bloc A, 3ème étage) (régularisation).| Permit type | Permis d'environnement | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 4 March 2022 | date the file was received |
| Public inquiry | 25 May 2022 – 24 June 2022 | |
| Consultation committee | 5 July 2022 | |
| Decision notified | 1 September 2022 | 181 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Declared complete
- Public inquiry opened
- Public inquiry closed
- Consultation committee
- Decision notified · Granted
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 81 m | Change of use | Création d'un dépôt de patrimoine pour la Maison du Pain, Musée de la Mode et de la Dentelle avec l'ajout d'ouvertures e | 2022 |
| 82 m | Tree felling | Abattre un arbre malade au-dessus d'une voie très fréquentée. | 2022 |
| 130 m | Signs and advertising | remplacer 1 mobilier urbain d’information avec support de publicité (BXL0535) | 2021 |
| 145 m | Change of use | Changer l'affectation et réaménager une concession automobile en équipement pour accueillir le campus d’entraînement pou | 2026 |
| 151 m | New construction | Construire une nouvelle salle de concert avec un espace d’accueil du public, un espace dédié aux artistes pouvant les lo | 2021 |
Other nearby cases : 04/PU/1992938
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)
