Skip to content
Altaica Urban
Granted

Antoon van Osslaan 1 (27-29)

Bruxelles · 04/IPE/2028807 · Permis d'environnement

Antoon van Osslaan 1 (27-29), Bruxelles: operation of installations. Case octroyé, lodged on 21 April 2026. The decision was notified on 8 July 2026, 78 days after lodging.

Modification du réseau d'installations de refroidissement lié à la construction de la phase 2 du datacenter et régularisation des installations de refroidissement non déclarées
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typePermis d'environnement
StatusOctroyé
Lodged on21 April 2026date the file was received
Public inquiry8 June 2026 – 23 June 2026
Decision notified8 July 202678 days
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Declared incomplete
  3. Declared complete
  4. Public inquiry opened
  5. Public inquiry closed
  6. Decision notified · Granted

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
0 mExtension or raisingd’une part, réaménager un centre de données, modifier les façades, rehausser le local technique, agrandir l’abri à vélos2025
0 mTree fellingabattre 30 arbres à haute tige en vue de construire un datacenter (permis A387/2019 et A536/2020)2024
89 mSigns and advertisingrenouveler un dispositif de publicité lumineuse double face2026
174 mEnergy worksRéaliser des travaux éléctriques et de génie civil dans l'enceinte du poste haute tension de Marly Placer des nouveaux 2021
202 mChange of usechanger l'affectation d'une salle de réunion en un commerce de type Horeca (sandwicherie) au rez-de-chaussée d'un bâtime2023

Other nearby cases : 04/PFD/1894574, 04/PU/1908276, 04/SFD/1924658

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)