Skip to content
AltUrb
Withdrawn

Boulevard Lambermont 1

Bruxelles · 04/IPE/609208 · Permis d'environnement

Boulevard Lambermont 1, Bruxelles: operation of installations. Case annulé, lodged on 23 August 2016. The decision was notified on 19 January 2017, 149 days after lodging.

Nettoyage à sec et blanchisserie
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typePermis d'environnement
StatusAnnulé
Lodged on23 August 2016date the file was received
Public inquiry11 November 2016 – 26 November 2016
Consultation committee6 December 2016
Decision notified19 January 2017149 days
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Declared incomplete
  3. Declared complete
  4. Public inquiry opened
  5. Public inquiry closed
  6. Consultation committee
  7. Decision notified · Withdrawn

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
6 mRoofconstruire une structure en toiture pour supporter l'installation de panneaux photovoltaïques2022
65 mSigns and advertisingmaintenir un panneau publicitaire de 87m² sur un pignon2025
74 mNew constructionInstaller un ensemble de 3 cabines haute tension.2024
151 mSigns and advertisingmaintenir l'exploitation d'un dispositif publicitaire par un nouveau panneau de 8 m²2024
151 mSigns and advertisingmaintenir l'exploitation d'un dispositif publicitaire par un nouveau panneau de 8 m²2023

Other nearby cases : 04/PFU/1922602, 04/PFD/1993795, 04/PU/1987379, 04/GOU_PU/2013079, 04/PFU/1896961, 04/PFU/2039422, 04/PFU/1963620

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)