Granted

Rue de Ransbeek 310

Bruxelles · 04/IPEEXT/1859956 · Extension / Transformation de PE

Rue de Ransbeek 310, Bruxelles: operation of installations. Case octroyé, lodged on 27 October 2022. The decision was notified on 23 November 2022, 27 days after lodging.

Modification de la rubrique 74-1A et 74-1B : conditionnement différent (200 à 50 litres), déplacement du dépôt, ajout de 300 litres d’azote. Quantité totale de 2400 litres.
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typeExtension / Transformation de PE
StatusOctroyé
Lodged on27 October 2022date the file was received
Decision notified23 November 202227 days
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Decision notified · Granted

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
0 mExtension or raisingd'une part, rehausser le bâtiment H du complexe Solvay et, d'autre part, poser un container de refroidissement d'eau (wa2022
0 mNew constructionConstruire un container pour un groupe de secours & installer une citerne à mazout2024
109 mDemolitiondémolir un ensemble de locaux préfabriqués devant le bâtiment E du campus Solvay, modifier un châssis et placer une port2023
128 mDemolition and reconstructiondémolir 5 hangars (mise en conformité) et reconstruire des cabines haute et basse tensions et un transformateur statique2022
128 mHeavy renovationcréer un atrium avec démolition partielle d'une dalle et de la façade arrière entre les deux ailes du bâtiment, modifier2021

Other nearby cases : 04/PU/1866264, 04/SFD/1930620, 04/PU/1968648, 04/PU/1939791, 04/PU/1975715, 04/PU/1908040

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)