Skip to content
AltUrb
Withdrawn

Rue de la Fusée 98–100

Bruxelles · 04/IPEEXT/1901075 · Extension / Transformation de PE

Rue de la Fusée 98–100, Bruxelles: extension or raising. Case annulé, lodged on 9 May 2023. The decision was notified on 31 May 2023, 22 days after lodging.

Modification art 7 bis: Agrandissement des laboratoires de 1544 m² (rubrique 85) et ajout d’une PAC de 16 KW (R32 10,6 kg) pour la crèche (rubrique 132a)
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typeExtension / Transformation de PE
StatusAnnulé
Lodged on9 May 2023date the file was received
Decision notified31 May 202322 days
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Decision notified · Withdrawn

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
1 mNew constructionagrandir la structure existante de l'entreprise avec une nouvelle aile industrielle, construire un nouveau bâtiment avec2023
24 mNew constructionEtendre des bâtiments et ajouter un nouveau bâtiment2023
24 mNew constructionagrandir la structure existante de l'entreprise avec une nouvelle aile industrielle (519m²), construire un nouveau bâtim2023
68 mChange of useRéaffecter l'entrée principale et une partie du 1er étage du bloc A, d'activité productive de biens matériels (data cent2022
152 mPublic spaceCréer une zone de remisage tram nocturne par la sécurisation du terminus existant « Eurocontrol » 2024

Other nearby cases : 04/PU/1943112

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)