Rue de la Fusée 98–100
Bruxelles · 04/IPEEXT/1901075 · Extension / Transformation de PE
Rue de la Fusée 98–100, Bruxelles: extension or raising. Case annulé, lodged on 9 May 2023. The decision was notified on 31 May 2023, 22 days after lodging.
Modification art 7 bis: Agrandissement des laboratoires de 1544 m² (rubrique 85) et ajout d’une PAC de 16 KW (R32 10,6 kg) pour la crèche (rubrique 132a)| Permit type | Extension / Transformation de PE | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 9 May 2023 | date the file was received |
| Decision notified | 31 May 2023 | 22 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Decision notified · Withdrawn
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 1 m | New construction | agrandir la structure existante de l'entreprise avec une nouvelle aile industrielle, construire un nouveau bâtiment avec | 2023 |
| 24 m | New construction | Etendre des bâtiments et ajouter un nouveau bâtiment | 2023 |
| 24 m | New construction | agrandir la structure existante de l'entreprise avec une nouvelle aile industrielle (519m²), construire un nouveau bâtim | 2023 |
| 68 m | Change of use | Réaffecter l'entrée principale et une partie du 1er étage du bloc A, d'activité productive de biens matériels (data cent | 2022 |
| 152 m | Public space | Créer une zone de remisage tram nocturne par la sécurisation du terminus existant « Eurocontrol » | 2024 |
Other nearby cases : 04/PU/1943112
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)