Skip to content
AltUrb
Granted

Keizerslaan 7

Bruxelles · 04/IPEEXT/2016244 · Extension / Transformation de PE

Keizerslaan 7, Bruxelles: operation of installations. Case octroyé, lodged on 13 January 2026. The decision was notified on 3 February 2026, 21 days after lodging.

Meerwerk wegens lek in leiding met leidingisolatie
The application's own description, in its source language (NL). Source: Nova.
Key figures
Permit typeExtension / Transformation de PE
StatusOctroyé
Lodged on13 January 2026date the file was received
Decision notified3 February 202621 days
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Decision notified · Granted

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
0 mRoofInstaller des garde-corps de sécurité sur l’ensemble des toitures.2026
0 mRoofRENOVATION DES TOITURES DE L’ONEM – Installation de garde-corps sur l’ensemble des toitures. Installation de panneaux ph2026
45 mFaçade and windowsmodifier le permis L1117/2019 : maintenir et intégrer une colonne en béton armé à la nouvelle façade et recouvrir cette 2023
45 mRoofimplanter en toiture un groupe de ventilation et placer des parois d'habillage autour des techniques (permis modificatif2022
45 mSigns and advertisinginstaller une enseigne parrallèle éclairée indirectement en façade avant2023

Other nearby cases : 04/PFU/1906247, 04/PFD/1996103, 04/PU/1870738, 04/PU/2015435, 04/PFD/2026834, 04/PFD/1950798, 04/PU/1907953, 04/PFU/1893109, 04/PFU/2003507, 04/PU/1855349, 04/PU/1959170, 04/PFU/1828065, 04/PFU/1843837, 04/PFD/1831708, 04/PU/2006745, 04/PU/1843019, 04/PU/1922695, 04/SFD/1869918, 04/PU/1843386, 04/PU/1851869, 04/PU/2030237, 04/PU/1836439, 04/PFU/1838715, 04/PU/1975723, 04/PFU/1864194

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)