Granted
Chaussée de Vilvorde 214
Bruxelles · 04/IPEEXT/2037789 · Extension / Transformation de PE
Chaussée de Vilvorde 214, Bruxelles: operation of installations. Case octroyé, lodged on 3 July 2026. The decision was notified on 23 July 2026, 20 days after lodging.
Modification du volume de bouteilles d'Inergen (72A), ajout d'un compresseur (71A), modification des dépôts de liquides inflammables (88.3C)| Permit type | Extension / Transformation de PE | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 3 July 2026 | date the file was received |
| Decision notified | 23 July 2026 | 20 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Decision notified · Granted
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 72 m | Energy works | Réaliser des travaux éléctriques et de génie civil dans l'enceinte du poste haute tension de Marly Placer des nouveaux | 2021 |
| 242 m | Extension or raising | d’une part, réaménager un centre de données, modifier les façades, rehausser le local technique, agrandir l’abri à vélos | 2025 |
| 242 m | Tree felling | abattre 30 arbres à haute tige en vue de construire un datacenter (permis A387/2019 et A536/2020) | 2024 |
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)