Rue Saint-Jean 32–38
Bruxelles · 04/IPEEXT/464238 · Extension / Transformation de PE
Rue Saint-Jean 32–38, Bruxelles: operation of installations. Case annulé, lodged on 3 April 2012. The decision was notified on 16 April 2012, 13 days after lodging.
Asbestwerf| Permit type | Extension / Transformation de PE | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 3 April 2012 | date the file was received |
| Decision notified | 16 April 2012 | 13 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Decision notified · Withdrawn
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 47 m | Heavy renovation | réaménager le duplex supérieur des 3e et 4e étages, créer une terrasse tropézienne en façade arrière et modifier le pan | 2024 |
| 47 m | Signs and advertising | placer une enseigne en façade avant et placer 2 stickers sur les vitrages de 2 châssis portant les mentions "Oh Lou Lou | 2024 |
| 52 m | Signs and advertising | placer une enseigne parallèle à la façade | 2026 |
| 56 m | Retail or horeca fit-out | changement d’utilisation d’un commerce vers un commerce où il y a la possibilité de consommer sur place (boissons) | 2026 |
| 56 m | Energy works | installer une centrale de traitement d'air et une pompe à chaleur sur la toiture de l'immeuble et habiller ces technique | 2022 |
Other nearby cases : 04/PU/1870738, 04/PU/1942070, 04/PFU/1984947, 04/PU/1843019, 04/PFU/1906247, 04/PU/1900256, 04/PU/1864929, 04/PU/1911963, 04/PU/1981296, 04/PU/1996275, 04/PFU/2012065, 04/PU/1821382, 04/PU/1994995, 04/PU/1907051, 04/PU/1943703, 04/PFU/1896640, 04/PU/1959170, 04/PU/2038123, 04/PU/1899840, 04/PU/1855750, 04/PFD/2040506, 04/PU/2038727, 04/PU/1834504, 04/PU/2006745, 04/PU/1855349
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)