Withdrawn
Chaussée de Vilvorde 214
Bruxelles · 04/IPEEXT/489191 · Extension / Transformation de PE
Chaussée de Vilvorde 214, Bruxelles: energy works. Case annulé, lodged on 27 June 2013. The decision was notified on 24 July 2013, 27 days after lodging.
vervanging koelinstallaties (verwijdering R22)| Permit type | Extension / Transformation de PE | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 27 June 2013 | date the file was received |
| Decision notified | 24 July 2013 | 27 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Decision notified · Withdrawn
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 72 m | Energy works | Réaliser des travaux éléctriques et de génie civil dans l'enceinte du poste haute tension de Marly Placer des nouveaux | 2021 |
| 242 m | Extension or raising | d’une part, réaménager un centre de données, modifier les façades, rehausser le local technique, agrandir l’abri à vélos | 2025 |
| 242 m | Tree felling | abattre 30 arbres à haute tige en vue de construire un datacenter (permis A387/2019 et A536/2020) | 2024 |
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)