Granted
Rue de Ransbeek 310
Bruxelles · 04/IPEEXT/696531 · Extension / Transformation de PE
Rue de Ransbeek 310, Bruxelles: operation of installations. Case octroyé, lodged on 23 August 2018. The decision was notified on 20 September 2018, 28 days after lodging.
Déplacement, modification et ajout d’installations classées dans le cadre du projet de centre de mise en œuvre de matériaux composites (1ère modif incomplète 690878)| Permit type | Extension / Transformation de PE | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 23 August 2018 | date the file was received |
| Decision notified | 20 September 2018 | 28 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Decision notified · Granted
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 0 m | Demolition | démolir un ensemble de locaux préfabriqués devant le bâtiment E du campus Solvay, modifier un châssis et placer une port | 2023 |
| 19 m | Demolition and reconstruction | démolir 5 hangars (mise en conformité) et reconstruire des cabines haute et basse tensions et un transformateur statique | 2022 |
| 19 m | Heavy renovation | créer un atrium avec démolition partielle d'une dalle et de la façade arrière entre les deux ailes du bâtiment, modifier | 2021 |
| 109 m | New construction | Construire un container pour un groupe de secours & installer une citerne à mazout | 2024 |
| 109 m | Extension or raising | d'une part, rehausser le bâtiment H du complexe Solvay et, d'autre part, poser un container de refroidissement d'eau (wa | 2022 |
Other nearby cases : 04/PU/1908040, 04/PU/1975715, 04/PU/1866264, 04/SFD/1930620, 04/PU/1939791, 04/PU/1968648, 04/PU/1844705
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)