Granted

Houtweg 99

Bruxelles · 04/IPEMOD/1992029 · Modification de conditions de PE

Houtweg 99, Bruxelles: operation of installations. Case octroyé, lodged on 25 June 2025.

MCH demande dérogation installation de refroidissement
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typeModification de conditions de PE
StatusOctroyé
Lodged on25 June 2025date the file was received
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
165 mNew constructionConstruire un poste d'interconnexion HT (haute tension) sur le site de Haren. Bâtiment sur 3 niveaux (sous-sol, rez-de-c2024
182 mPublic spaceDéfricher un terrain et modifier son relief (mise en conformité), créer un parc de stationnement d'autobus pour 49 véhic2025
182 mOtherAménager un parking privé de 49 emplacements, abattre 2 arbres à haute tige, régulariser l'abattage d'arbres à haute tig2024
182 mPublic spaced’une part, déboiser et modifier le relief d’un terrain (mise en conformité) et d’autre part aménager un parc de station2025
189 mFaçade and windowsremplacer une porte de garage2022

Other nearby cases : 04/PFD/1841728, 04/PU/2029339, 04/PU/1931425, 04/PU/1856814, 04/PU/1866619, 04/PU/1950038, 04/PU/2044664, 04/SFD/1913137, 04/PU/1826668, 04/PFD/1993577