Granted
Houtweg 99
Bruxelles · 04/IPEMOD/1992029 · Modification de conditions de PE
Houtweg 99, Bruxelles: operation of installations. Case octroyé, lodged on 25 June 2025.
MCH demande dérogation installation de refroidissement| Permit type | Modification de conditions de PE | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 25 June 2025 | date the file was received |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 165 m | New construction | Construire un poste d'interconnexion HT (haute tension) sur le site de Haren. Bâtiment sur 3 niveaux (sous-sol, rez-de-c | 2024 |
| 182 m | Public space | Défricher un terrain et modifier son relief (mise en conformité), créer un parc de stationnement d'autobus pour 49 véhic | 2025 |
| 182 m | Other | Aménager un parking privé de 49 emplacements, abattre 2 arbres à haute tige, régulariser l'abattage d'arbres à haute tig | 2024 |
| 182 m | Public space | d’une part, déboiser et modifier le relief d’un terrain (mise en conformité) et d’autre part aménager un parc de station | 2025 |
| 189 m | Façade and windows | remplacer une porte de garage | 2022 |
Other nearby cases : 04/PFD/1841728, 04/PU/2029339, 04/PU/1931425, 04/PU/1856814, 04/PU/1866619, 04/PU/1950038, 04/PU/2044664, 04/SFD/1913137, 04/PU/1826668, 04/PFD/1993577
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)