Skip to content
Altaica Urban
Withdrawn

Monnoyer Kaai 11 t.h.v. poort B18 (Voorhaven)

Bruxelles · 04/IPEMOD/2011976 · Modification de conditions de PE

Monnoyer Kaai 11 t.h.v. poort B18 (Voorhaven), Bruxelles: operation of installations. Case annulé, lodged on 3 December 2025.

Wijziging voor stopzetting grondwaterwinning. MOC ingediend via MyPermit, echter moest het een MIC zijn.
The application's own description, in its source language (NL). Source: Nova.
Key figures
Permit typeModification de conditions de PE
StatusAnnulé
Lodged on3 December 2025date the file was received
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
16 mDemolitionDémolir deux ouvrages d'art qui permettaient le croisement entre l'ancienne ligne 26A et les chemins de service du site 2022
118 mNew constructionConstruire de nouvelles soutes de stockage avec et sans couverture, la construction d'un nouveau bâtiment de bureaux, le2022
149 mNew constructionConstruire un centre de collecte et recyclage des déchets métalliques, électriques, électroniques et informatiques.2023
149 mHeavy renovationModifier le permis d'urbanisme délivré le 02/08/2024 (permis modificatif : 04/PFD/1903854), réaliser des modifications s2025
243 mOtherCréer une zone de stockage en arrière du quai du canal.2022

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)