Rue du Marquis 1–3
Bruxelles · 04/IPEPLP/1761288 · Prolongation de PE
Rue du Marquis 1–3, Bruxelles: operation of installations. Case annulé, lodged on 18 September 2020. The decision was notified on 21 January 2022, 490 days after lodging.
exploitation d'un immeuble de bureaux| Permit type | Prolongation de PE | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 18 September 2020 | date the file was received |
| Decision notified | 21 January 2022 | 490 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Declared incomplete
- Declared complete
- Decision notified · Withdrawn
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 0 m | Energy works | placer une installation photovoltaïque (panneaux solaires) | 2024 |
| 0 m | Energy works | placer une installation photovoltaïque (panneaux solaires) en toiture | 2024 |
| 0 m | Façade and windows | modifier les façades du bâtiment en supprimant les parements décoratifs vitrés au droit des allèges | 2026 |
| 42 m | Public space | Créer un terminus de bus électrique rue de Loxum/Place Sainte-Gudule sur le territoire de la Ville de Bruxelles | 2022 |
| 65 m | Heavy renovation | Conserver les arcades existantes au rez-de-chaussée, modifier le revêtement de façade des pignons et des constructions e | 2023 |
Other nearby cases : 04/PU/1822818, 04/PFD/1827319, 04/PU/1949203, 04/PU/1945325, 04/PFU/2010520, 04/GOU_PU/1827266, 04/PFU/1925761, 04/PU/1895777, 04/PFU/1906196, 04/PU/2021835, 04/PU/1996621, 04/PU/2036264, 04/PFU/2028861, 04/PFD/1969054, 04/GOU_PU/1988658, 04/PFD/1988944, 04/PU/1810247, 04/PU/1963468, 04/PU/1846102, 04/GOU_PU/1915741, 04/PFU/1831188, 04/PU/1836401, 04/PU/1831368, 04/PU/2005912, 04/PFU/2032986