Skip to content
Altaica Urban
Granted

Avenue Antoon van Oss 1B

Bruxelles · 04/IPEPLP/1826311 · Prolongation de PE

Avenue Antoon van Oss 1B, Bruxelles: operation of installations. Case octroyé, lodged on 17 December 2021. The decision was notified on 19 December 2022, 367 days after lodging.

uitbatting voor een werkplaats voor de fabricatie en kleuring van aluminium ramen en frames voor veranda's
The application's own description, in its source language (NL). Source: Nova.
Key figures
Permit typeProlongation de PE
StatusOctroyé
Lodged on17 December 2021date the file was received
Decision notified19 December 2022367 days
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Declared incomplete
  3. Declared complete
  4. Decision notified · Granted

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
76 mSigns and advertisingrenouveler un dispositif de publicité lumineuse double face2026
98 mChange of usechanger l'affectation d'une salle de réunion en un commerce de type Horeca (sandwicherie) au rez-de-chaussée d'un bâtime2023
107 mExtension or raisingd’une part, réaménager un centre de données, modifier les façades, rehausser le local technique, agrandir l’abri à vélos2025
107 mTree fellingabattre 30 arbres à haute tige en vue de construire un datacenter (permis A387/2019 et A536/2020)2024
135 mNew constructionconstruire 2 cabines haute tension sur un dépôt de bus et abattre un arbre2023

Other nearby cases : 04/SFD/1924658

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)