Granted
Rue du Dobbelenberg 8
Bruxelles · 04/IPEPLP/487058 · Prolongation de PE
Rue du Dobbelenberg 8, Bruxelles: operation of installations. Case octroyé, lodged on 8 May 2013. The decision was notified on 11 April 2014, 338 days after lodging.
Verlenging van vergunning voor opslag van werfmateriaal met metaalwerkplaats en enkele kantoren| Permit type | Prolongation de PE | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 8 May 2013 | date the file was received |
| Decision notified | 11 April 2014 | 338 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Declared incomplete
- Declared complete
- Decision notified · Granted
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 79 m | Public space | Voor het project Border Buda, een samenwerking tussen Brussel, Machelen en Vilvoorde, werd een kunstwerk geplaatst op he | 2024 |
| 80 m | Public space | Placer une œuvre d'art sur la place du Chicon | 2024 |
| 141 m | Heavy renovation | créer des bureaux et des sanitaires pour l'entrepôt dans le bâtiment existant, rénover la façade, démolir un auvent et r | 2022 |
| 172 m | Change of use | aménager un logement complémentaire et accessoire (74m²) au troisième étage d'un immeuble industriel destiné à un entrep | 2025 |
| 225 m | Tree felling | Heraanleg terrein en bouw keermuren (zie verklarende nota) | 2024 |
Other nearby cases : 04/PFD/1994554
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)