Skip to content
AltUrb
Granted

Rue du Dobbelenberg 8

Bruxelles · 04/IPEPLP/487058 · Prolongation de PE

Rue du Dobbelenberg 8, Bruxelles: operation of installations. Case octroyé, lodged on 8 May 2013. The decision was notified on 11 April 2014, 338 days after lodging.

Verlenging van vergunning voor opslag van werfmateriaal met metaalwerkplaats en enkele kantoren
The application's own description, in its source language (NL). Source: Nova.
Key figures
Permit typeProlongation de PE
StatusOctroyé
Lodged on8 May 2013date the file was received
Decision notified11 April 2014338 days
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Declared incomplete
  3. Declared complete
  4. Decision notified · Granted

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
79 mPublic spaceVoor het project Border Buda, een samenwerking tussen Brussel, Machelen en Vilvoorde, werd een kunstwerk geplaatst op he2024
80 mPublic spacePlacer une œuvre d'art sur la place du Chicon2024
141 mHeavy renovationcréer des bureaux et des sanitaires pour l'entrepôt dans le bâtiment existant, rénover la façade, démolir un auvent et r2022
172 mChange of useaménager un logement complémentaire et accessoire (74m²) au troisième étage d'un immeuble industriel destiné à un entrep2025
225 mTree fellingHeraanleg terrein en bouw keermuren (zie verklarende nota)2024

Other nearby cases : 04/PFD/1994554

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)