Granted
Avenue de Tyras 109
Bruxelles · 04/IPEPLP/496902 · Prolongation de PE
Avenue de Tyras 109, Bruxelles: operation of installations. Case octroyé, lodged on 27 January 2014. The decision was notified on 25 November 2014, 302 days after lodging.
Verlenging van de milieuvergunning| Permit type | Prolongation de PE | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 27 January 2014 | date the file was received |
| Decision notified | 25 November 2014 | 302 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Declared complete
- Decision notified · Granted
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 66 m | Tree felling | Abattre un arbre situé dans une zone de 3 mètres mesuré des deux côtés de l'axe d'une conduite de transport de gaz natur | 2025 |
| 78 m | Other | placer 4 conteneurs dont 2 frigorifiques avec 1 sas logistique, et 2 zones de stockage, et modifier le relief de 60 cm ( | 2025 |
| 78 m | New construction | construire un Cuve Aérienne de Saumure (mise en conformité) | 2023 |
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)
