Granted
Avenue Antoon van Oss 1
Bruxelles · 04/IPEPLP/585607 · Prolongation de PE
Avenue Antoon van Oss 1, Bruxelles: operation of installations. Case octroyé, lodged on 16 November 2015. The decision was notified on 11 May 2016, 177 days after lodging.
Prolongation du permis d’environnement n°01/0252 (70315) pour l’exploitation d’un poste haute-tension (Marly).| Permit type | Prolongation de PE | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 16 November 2015 | date the file was received |
| Decision notified | 11 May 2016 | 177 days |
| Works started | 19 November 2016 | |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Declared incomplete
- Declared complete
- Decision notified · Granted
- Works started
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 103 m | Change of use | changer l'affectation d'une salle de réunion en un commerce de type Horeca (sandwicherie) au rez-de-chaussée d'un bâtime | 2023 |
| 109 m | Extension or raising | d’une part, réaménager un centre de données, modifier les façades, rehausser le local technique, agrandir l’abri à vélos | 2025 |
| 109 m | Tree felling | abattre 30 arbres à haute tige en vue de construire un datacenter (permis A387/2019 et A536/2020) | 2024 |
| 116 m | Signs and advertising | renouveler un dispositif de publicité lumineuse double face | 2026 |
| 175 m | New construction | construire 2 cabines haute tension sur un dépôt de bus et abattre un arbre | 2023 |
Other nearby cases : 04/SFD/1924658, 04/PFD/1824404
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)