Boulevard Barthélémy 35
Bruxelles · 04/IPETMP/484439 · Permis d'environnement temporaire
Boulevard Barthélémy 35, Bruxelles: operation of installations. Case annulé, lodged on 8 March 2013. The decision was notified on 30 May 2013, 83 days after lodging.
Asbestwerf| Permit type | Permis d'environnement temporaire | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 8 March 2013 | date the file was received |
| Decision notified | 30 May 2013 | 83 days |
| Works started | 29 July 2013 | |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Declared incomplete
- Decision notified · Withdrawn
- Works started
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 66 m | Signs and advertising | remplacer 1 mobilier urbain d’information avec support de publicité (BXL0466) | 2022 |
| 82 m | Extension or raising | construire une extension sur la toiture du bâtiment et aménager une terrasse | 2022 |
| 113 m | Change of use | la transformation et le changement partiel de destination d'une sandwicherie (260m²) et d'une activité productive (ateli | 2022 |
| 120 m | Demolition and reconstruction | démolir les constructions existantes et construire deux immeubles de 9 logements et 8 logements | 2023 |
| 120 m | Demolition and reconstruction | démolir les constructions existantes et construire un immeuble de 10 logements | 2022 |
Other nearby cases : 04/PU/1827886, 04/PFD/1933738, 04/PU/1934068, 04/PU/1941949, 12/PU/1842124, 04/PU/1892290, 04/PU/1810574, 04/PU/1962407, 12/PFD/1946751, 12/PFD/1947648, 12/PU/1946062, 04/PU/2019107, 04/PU/1972958, 12/PU/1844013, 04/PFU/1992763, 04/PFU/1948045, 04/PFD/2008620, 04/PU/1951120, 04/PFD/2036161, 12/PFD/1974705, 04/SFD/1904187, 12/PU/1918454, 04/SFD/1906194, 04/PU/1856182, 04/PU/1943535
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)