Withdrawn
Square de l'Atomium 1–BUS 211
Bruxelles · 04/IPETMP/603478 · Permis d'environnement temporaire
Square de l'Atomium 1–BUS 211, Bruxelles: operation of installations. Case annulé, lodged on 20 June 2016. The decision was notified on 14 July 2016, 24 days after lodging.
Asbestwerf| Permit type | Permis d'environnement temporaire | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 20 June 2016 | date the file was received |
| Decision notified | 14 July 2016 | 24 days |
| Works started | 19 September 2016 | |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Declared complete
- Decision notified · Withdrawn
- Works started
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 32 m | Other | placer une œuvre d’art « RockGrowth 800 » (régularisation) | 2022 |
| 214 m | New construction | construire une annexe modulaire temporaire de 120m² sur 2 niveaux liée à la gestion et l’entretien du parc Mini-Europe | 2025 |
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)